
SPRING APPLIED AIR RELEASE (SAAR) BRAKE ASSEMBLY INSTALLATION
Four Wheel Drive Dynos
Version 1 Spring Applied Air Release (SAAR) Brake Assembly Installation
21
Figure 22: Connect from Solenoid to the Movement Board in the Control Box
IN BRK 1BRK 2
+12V GND OUTINCOMBRK IN
OUTRAIL
-- PRES SW
BR033
movement board
control box
connect air
hose to
solenoid,
replace hose
if needed
connect the two black wires
from the brake solenoid to
the terminals labelled
BRK 2 on movement board
Comentarios a estos manuales